AI that drafts the updates and watches every budget.

We train your office and field teams to use AI on real jobs, build agents for the paperwork, and connect it all to the tools your office already runs on.

01The situation

Where the hours go in construction companies.

A general contractor with 120 people runs 12 to 20 jobs at once, and most of the office's week goes to paper that moves between project management, accounting and the field. Submittals wait in a project manager's queue, pay applications are assembled by hand from Sage 300 reports, and estimators level subcontractor bids in spreadsheets during the busiest bid weeks.

On a normal day

Job 214, one of 15 active jobs, has a $430,000 budget. Sage 300 shows $412,800 spent, approved change orders sitting in email add $18,400 that never posted, and the Friday spreadsheet says $397,150. Depending on which source the project manager opens, the job is $17,200 under budget, $1,200 over, or $32,850 under, and the same gap exists on every other job.

The scene above is an illustration built from typical figures, not a client record.

02Follow one job

From the bid set to final payment. The agent reads, a person signs off.

One job, bid set to final payment
Ten points where an agent reads the paperwork and a person signs off
Stage 1 of 10 · Bid · Preconstruction

Takeoff, model and estimate from the bid set

PDFQuantity takeoff · bid set with Addenda 1 and 2Example · Job 231, 4-story wood-frame multifamily · Bid set · drawings, specs and addendaAgent reading
  • Quantities taken off by CSI division
  • Model built from the plans
  • Estimate priced from your costs on past jobs
  • Architectural checked against structural and MEP
  • Schedules checked against plans
  • Bid set checked against every addendum
DivisionItemQtyUnitFrom
03 30 00Slab on grade, 5 in.15,200SFS-101
06 17 33Floor framing, I-joists, levels 2 to 445,600SFS-102 to S-104
06 17 53Roof trusses, pre-engineered16,400SFS-105
06 11 00Exterior wall framing, 2x6Priced from your last six wood-frame jobs24,300SFA-201 to A-204
06 18 13Glulam beam GL-3, level 3Drawn where M-203, level 3, runs the main supply duct24LFS-103
08 14 16Unit entry doors and frames, per door schedule60EAA-601
08 14 16Doors added by Addendum 2, not on A-6016EAADD-2
FlaggedPrices the framing off your last six wood-frame jobs, and flags the doors added in Addendum 2 plus the level 3 beam drawn right where the mechanical sheets run the main duct.
What the agent does

A takeoff system the company owns reads the drawing set, takes off quantities by CSI division, builds a model from the plans, and prices the estimate from the company's own costs on past jobs. It then checks the set against itself (architectural against structural and MEP, schedules against plans, bid set against every addendum) and lists each conflict and each item it could not count.

Waiting on the chief estimator

Nothing goes out until a person approves it. Who approves here: Chief estimator, who sets the carry number.

Nothing goes out until a person approves it.Click a stage, or use the arrow keys.

Illustrations of typical work in this industry, not client records. Results are measured on your own work.

Repeat work in a 120-person firm

350 hours every week, on the department work and the checks above

That is about 9 full-time people reading, keying, checking and chasing the same kinds of work every week. Agents take the first pass on all of it, and a person approves.

What our clients cut

85 to 95% less time on the work we build

A construction company: bank draw applications went from 10 hours to 1.5, submittal reviews from 4 hours to 15 minutes. A 15-person bookkeeping firm: data entry down 95%. Your numbers are measured on your own work.

The most cautious version, and how we count it
Where the hours come fromHours spent nowHours saved
Agents on the department work (see it by department, below)317112
The checks in the walk-through above (3 of ten; the rest are already inside a department row)329
Everyday AI use by the whole team after training: 47 office staff at 40 hours a week, minus the work above, saving 5.4% (the average measured across workers who use AI)153283
Total hours saved a week, rounded200

The most cautious math: published study averages, spread across everyone in the firm, including people who barely use AI. Even at those rates the firm gets back about 200 hours a week. Work rebuilt around an agent saves far more, as the client results above show. Professionals surveyed by Thomson Reuters expect about 5 hours a week (2025).

Office staff: 47 of 120. 38.9% of nonresidential building contractors' staff (NAICS 236200) work in management, business, sales and office roles; the rest are field crews (BLS staffing patterns, May 2025). Field crews, clinicians and floor staff are not counted.

Inputs by department and check
  • Project management: 12 people, 6.5 hours a week each. 12 project managers and assistants: 30 submittals a week at 1.5 hours, 15 owner reports at 1 hour, 12 RFI drafts at 1.5 hours Our estimate, measured on your own work.
  • Accounting: 8 people, 10 hours a week each. 8 accounting staff: 150 subcontractor invoices at 12 minutes, 15 pay application packages at 1.5 hours, 100 lien waivers at 17 minutes a week Our estimate, using Payapps contractor survey, 2026: 1.5 hours to prepare a pay application.
  • Estimating: 6 people, 12 hours a week each. 6 estimators: 8 bids a week, about 4 hours of scope review and 5 hours of leveling per bid Our estimate, measured on your own work.
  • Field operations: 8 people, 6 hours a week each. 8 superintendents and field coordinators: 15 jobs, daily reports at 20 minutes, 15 safety checklists at 1 hour, 8 hours of photo logs a week Our estimate, measured on your own work.
  • Contracts and risk: 5 people, 7.7 hours a week each. 5 contracts and risk staff: 6 subcontracts at 2 hours, 100 insurance certificate checks at 10 minutes, 40 change order log entries at 15 minutes a week Our estimate, measured on your own work.
  • Takeoff, model and estimate from the bid set: 18 hours a week today. 6 takeoffs a week at about 3 hours each Our estimate, measured on your own work.
  • Bid leveling sub quotes line by line: counted in Estimating above.
  • Scope gaps between sub bids and the spec book: counted in Estimating above.
  • Closeout checked against Division 01: 6 hours a week today. 3 closeout checks a week at 2 hours each Our estimate, measured on your own work.
  • Bid packages built from drawings and specs: 8 hours a week today. 8 bid packages a week at 1 hour each Our estimate, measured on your own work.
  • Drawings, model and spec book disagree: counted in Estimating above.
  • Submittal review against the spec section: counted in Project management above.
  • RFIs and change orders tied to the contract: counted in Project management above.
  • Pay apps, lien waivers and retainage: counted in Accounting above.
  • Sub insurance read before they mobilize: counted in Contracts and risk above.

AI also does worse on some work (in the Harvard and BCG study, accuracy fell 19 points on tasks outside its range), which is why a person reviews everything. Hours are the value of staff time, counted before the cost of the agents.

See it by department
DepartmentRepeat workWhat AI doesA person stillHours a week today
Project managementSubmittal review, RFI drafting, weekly owner reports across 15 active jobsChecks each submittal against the spec section and drafts the review comments; drafts RFIs and owner reports from job dataThe project manager edits and sends every review, RFI and report78
AccountingSubcontractor invoice coding, pay application backup, lien waiver trackingCodes invoices to job and cost code in Sage 300, assembles pay application backup, tracks missing lien waiversThe controller approves coding and every pay application80
EstimatingBid invitations, scope review, leveling subcontractor bidsReads the bid set, builds a scope checklist by trade, levels sub bids into one comparison with exclusions called outThe estimator sets the number and signs the bid72
Field operationsDaily reports, safety checklists, photo logsTurns superintendent voice notes and photos into the daily report; compiles safety status across sites each weekThe superintendent confirms each report48
Contracts and riskSubcontract drafting, insurance certificate tracking, change order logsDrafts subcontracts from your templates, flags expiring certificates, posts approved change orders to the job budgetThe contracts manager approves every subcontract; the PM approves change orders39
03The first build

The first build worth making.

Start here

Submittal review against the specs

Why it comes first

Each submittal takes a project manager hours of reading against the plan set and owner specifications, and a late review holds up procurement. The right answer is written in the spec section, so the agent's work can be checked line by line.

How it is scored before launch

Before launch it runs on 30 past submittals your PMs already reviewed. We compare its flagged issues with what the PMs actually caught, and it goes live only when it matches the score your team sets.

04Your systems

What it connects to.

Agents work inside the tools your team already runs. Tools named here are common in construction companies; yours may differ.

  • QuickBooks
  • Sage 300 CRE
  • Bluebeam
  • Outlook
  • DocuSign

Software it can replace

  • A construction management platform your team works around
  • Document storage tools
  • Separate reporting software

Manual work it removes

  • Budget spreadsheets updated by hand
  • Change orders tracked in email

We recommend replacing a tool only when owning the software costs less than what you spend on it today. The tool and cost report decides line by line.

05Governance

Controls for construction companies, in place before launch.

Field and office

Drawings and certificates carry a status, so the field works from the current set, and job cost data is limited to the project team and accounting.

Who approves what

Project managers approve every submittal review, RFI and owner report. The controller approves invoice coding and pay applications. Nothing reaches an owner, architect or subcontractor without a named person's approval.

Access, hosting and ownership

Access is set by role, every view and change is logged, and AI never trains on your records. Hosted on SOC 2 Type 2, ISO 27001 and HIPAA-ready infrastructure, with the code, data and accounts in your company's name.

06How an engagement starts

Map before we build.

Every engagement starts with a free build: we map one workflow, put a working tool on it with your own data and train the people who use it, in two weeks at no cost.

Other industries
Start a conversation

See where AI fits in your business.

A first call about how your teams work and where AI fits. We reply the same business day.

We reply the same business day with times for a 30-minute call.