NovumAI
Industries · AI for manufacturers

AI that tracks orders, inventory, and the floor.

We train your team to use AI on daily operations, build tools for orders, inventory, and production status, and connect them to the ERP and accounting tools you already run.

01The situation

Where the hours go in manufacturers.

A manufacturer of about 120 people, most of them on the floor, runs its office lean, and the office sets how much work the shop can take. Estimators turn around a fraction of incoming RFQs, customer service walks the floor to answer ship-date questions, and quality writes certificates and nonconformance reports by hand.

On a normal day

Twenty-five RFQs arrived this week and the two estimators will quote eight. Customer service has 30 ship-date questions open, and each one means a walk to the floor.

The scene above is an illustration built from typical figures, not a client record.

02Follow one job

From the RFQ to the shipped part. The agent checks the paperwork, a person makes the call.

One job, RFQ to shipment
Ten points where an agent reads the paperwork and a person signs off
Stage 1 of 10 · Quote · Sales / quoting

RFQ package read before quoting

PDFRFQ 26-0907 · Talon Peak SystemsQuote worksheetExample · RFQ email Tue, Sep 8, 2026, with drawings and specs · RFQ package · email, drawings and specsAgent reading
  • Material and quantities
  • Tolerances and finishes
  • Heat treat and inspection requirements
  • Certification requirements
  • Past jobs on similar parts from the ERP
  • Quote worksheet drafted
Housing 4410-200 rev B · Cover 4410-210 rev A
RFQ email
Quantity
50 housings, 50 covers
Requested ship
Fri, Nov 13, 2026
Inspection
Standard
Certs
Material certs and CoC
Drawings and specs
Housing
17-4 PH bar, heat treat H1025
Cover
7075-T651 bar, anodize Type II, Class 2, black
Tightest tolerance
Housing bore Ø1.2500 ±.0010
Housing note 6
Passivate after heat treatNot in the RFQ email
Note 9, both drawings
Full first article reportRFQ email says standard inspection
25-0932Housing 4410-200 rev A, 50 pcs · mill quoted 18.0 h21.8 h actual
26-0418Housing 4410-200 rev B, 50 pcs · mill quoted 18.0 h22.5 h actual
26-0611Cover 4410-210 rev A, 50 pcs · anodize outsideOn budget
FlaggedFlags a drawing note requiring passivation and a full first article report that the RFQ email never mentioned.
What the agent does

Reads the RFQ email, drawing PDFs and specs, lists material, quantities, tolerances, finishes, heat treat, inspection and certification requirements, and drafts a quote worksheet with past jobs on similar parts pulled from the ERP.

Waiting on the estimator

Nothing goes out until a person approves it. Who approves here: Estimator sets hours, price and lead time.

Nothing goes out until a person approves it.Click a stage, or use the arrow keys.

Illustrations of typical work in this industry, not client records. Results are measured on your own work.

Repeat work in a 120-person firm

160 hours every week, on the department work and the checks above

That is about 4 full-time people reading, keying, checking and chasing the same kinds of work every week. Agents take the first pass on all of it, and a person approves.

What our clients cut

85 to 95% less time on the work we build

A construction company: bank draw applications went from 10 hours to 1.5, submittal reviews from 4 hours to 15 minutes. A 15-person bookkeeping firm: data entry down 95%. Your numbers are measured on your own work.

The most cautious version, and how we count it
Where the hours come fromHours spent nowHours saved
Agents on the department work (see it by department, below)14651
The checks in the walk-through above (4 of ten; the rest are already inside a department row)154
Everyday AI use by the whole team after training: 28 office staff at 40 hours a week, minus the work above, saving 5.4% (the average measured across workers who use AI)96052
Total hours saved a week, rounded110

The most cautious math: published study averages, spread across everyone in the firm, including people who barely use AI. Even at those rates the firm gets back about 110 hours a week. Work rebuilt around an agent saves far more, as the client results above show. Professionals surveyed by Thomson Reuters expect about 5 hours a week (2025).

Office staff: 28 of 120. 23.6% of fabricated metal manufacturers' staff (NAICS 332000) work in office, sales and management roles; the rest are on the floor (BLS staffing patterns, May 2025). Field crews, clinicians and floor staff are not counted.

Inputs by department and check
  • Quoting and estimating: 6 people, 5 hours a week each. 6 estimators: 30 RFQs a week at 60 minutes each Our estimate, using Modern Machine Shop, 2021 (sponsored): up to 2 hours to quote a single part.
  • Customer service: 5 people, 3.8 hours a week each. 5 customer service reps: 45 customer POs at 15 minutes, 75 where's-my-order emails at 6 minutes a week Our estimate, measured on your own work.
  • Purchasing: 4 people, 7.5 hours a week each. 4 purchasing staff: 120 supplier invoices at 5 minutes, 30 reorder POs at 20 minutes, 40 expedites and acknowledgments at 15 minutes Our estimate, measured on your own work.
  • Quality: 6 people, 8.5 hours a week each. 6 quality staff: 9 first article reports at 2 hours and 60 certificate packets at 10 minutes, plus 25 nonconformance and inspection reports at 48 minutes Our estimate, measured on your own work.
  • Production planning: 4 people, 3.9 hours a week each. 4 production planners: daily late list at 1.5 hours (7.5 hours a week) and a weekly scrap report for 8 lines at 1 hour each Our estimate, measured on your own work.
  • RFQ package read before quoting: counted in Quoting and estimating above.
  • Outside processing and material pricing: counted in Quoting and estimating above.
  • Customer PO checked against the quote: counted in Customer service above.
  • Drawing revision compare: 4 hours a week today. 20 drawing revisions a week at 12 minutes to compare Our estimate, measured on your own work.
  • Certificate packet per shipment: counted in Quality above.
  • First article and PPAP paperwork: counted in Quality above.
  • Customer flowdowns carried to supplier POs: 3 hours a week today. 30 POs a week, 6 minutes each checking quality clauses flow to supplier POs Our estimate, measured on your own work.
  • Late job early warning: counted in Production planning above.
  • Heat-lot traceability from a bad lot: 1.5 hours a week today. 2 lot traceability searches a week, about 45 minutes each Our estimate, measured on your own work.
  • Quoted versus actual hours by job: 6 hours a week today. weekly review of quoted versus actual hours on closed jobs, about 6 hours Our estimate, measured on your own work.

AI also does worse on some work (in the Harvard and BCG study, accuracy fell 19 points on tasks outside its range), which is why a person reviews everything. Hours are the value of staff time, counted before the cost of the agents.

See it by department
DepartmentRepeat workWhat AI doesA person stillHours a week today
Quoting and estimatingRFQ review, reading drawings, building quotesReads the RFQ and drawings, pulls similar past jobs and their actual costs, drafts the quoteThe estimator sets the price30
Customer serviceOrder entry, order status, ship-date questionsDrafts sales orders from customer POs and answers status from shop dataA CSR approves each order and reply19
PurchasingReorder POs, supplier expedites, invoice matchingDrafts POs for material below reorder point and matches invoices to receiptsA buyer approves every PO30
QualityInspection reports, nonconformance reports, certificates of conformanceDrafts NCRs and certificates from inspection dataThe quality manager signs51
Production planningLate order lists, scrap reportsCompiles the daily late list and scrap by lineThe planner decides the schedule16
03The first build

The first build worth making.

Start here

RFQ to draft quote

Why it comes first

Quoting capacity caps how much work the shop can win. Your past quotes and job costs already hold the answer for most parts, so the agent's draft can be checked against real outcomes.

How it is scored before launch

Before launch it quotes 50 past RFQs. We compare its drafts with what you quoted and what the jobs actually cost, and it goes live only when it meets the accuracy your estimator sets.

04Your systems

What it connects to.

Agents work inside the tools your team already runs. Tools named here are common in manufacturers; yours may differ.

  • Epicor Kinetic
  • NetSuite
  • Microsoft Dynamics 365
  • SolidWorks
  • QuickBooks
  • Outlook

Software it can replace

  • Standalone quality tracking software
  • Disconnected purchasing tools

Manual work it removes

  • Inventory spreadsheets
  • Production reports compiled by hand

We recommend replacing a tool only when owning the software costs less than what you spend on it today. The tool and cost report decides line by line.

05Governance

Controls for manufacturers, in place before launch.

Quality records and drawings

Customer drawings, inspection logs and supplier documents are limited by role, and every certificate traces to the inspection data it came from.

Who approves what

Estimators approve every quote. Buyers approve every purchase order before it reaches a supplier. The quality manager signs every certificate and NCR.

Access, hosting and ownership

Access is set by role, every view and change is logged, and AI never trains on your records. Hosted on SOC 2 Type 2, ISO 27001 and HIPAA-ready infrastructure, with the code, data and accounts in your company's name.

06How an engagement starts

Map before we build.

Every engagement starts with a free build: we map one workflow, put a working tool on it with your own data and train the people who use it, in two weeks at no cost.

Other industries
Start a conversation

See where AI fits in your business.

A first call about how your teams work and where AI fits. We reply the same business day.

We reply the same business day with times for a 30-minute call.